High Bar plateau
High Bar plateau
High Bar operating
High Bar operating
Wash deck
Wash deck
United Metals Original POD
United Metals Original POD

Water for this mine is also available from the Burnt River, from the original United Mining and Metals Point Of Diversion (P.O.D.). This is a close-up of the concrete pad at the P.O.D. showing the company name (UMM) and the date.

High Bar Material
High Bar Material
Assembly
Assembly
Retaining wall installation
Retaining wall installation
High Bar Assembly
High Bar Assembly
HB Blue Wheel Capture
HB Blue Wheel Capture
HB Finishing Table
HB Finishing Table
High Bar Winter
High Bar Winter
Well Drilling
Well Drilling

Drilling the first powerful well.

1/3

Current Operation

The photographs and descriptions on this page show the set-up and bulk testing operations that have been conducted at the High Bar mine by the current owners. Click on each picture for a description.