High Bar plateau
High Bar plateau
press to zoom
High Bar operating
High Bar operating
press to zoom
Wash deck
Wash deck
press to zoom
United Metals Original POD
United Metals Original POD

Water for this mine is also available from the Burnt River, from the original United Mining and Metals Point Of Diversion (P.O.D.). This is a close-up of the concrete pad at the P.O.D. showing the company name (UMM) and the date.

press to zoom
High Bar Material
High Bar Material
press to zoom
Assembly
Assembly
press to zoom
Retaining wall installation
Retaining wall installation
press to zoom
High Bar Assembly
High Bar Assembly
press to zoom
HB Blue Wheel Capture
HB Blue Wheel Capture
press to zoom
HB Finishing Table
HB Finishing Table
press to zoom
High Bar Winter
High Bar Winter
press to zoom
Well Drilling
Well Drilling

Drilling the first powerful well.

press to zoom
1/3

Current Operation

The photographs and descriptions on this page show the set-up and bulk testing operations that have been conducted at the High Bar mine by the current owners. Click on each picture for a description.